A brand new 165,000 square foot Costco facility in Bellingham, WA. LangCo NW, Inc, was contracted to provide turn-key service for the foundation, slabs with sawcut service, and building site-work. With demanding specifications for floor flatness and levelness in this high-traffic building, LangCo NW, Inc. was able to deliver super flat floors with the use of our […]
44,000 sq. ft. of place and finish utilizing our SOMERO SXP Laser Screed.
The new facility for Navy Federal Credit Union in Oak Harbor, WA. LangCo NW, Inc. was subcontracted to form, pour, and finish the foundation, slabs, sitework, and the 34,000 +/- square foot Pervious Concrete parking lot.
This 12,000 square foot tilt-up concrete project is located in Everett, Washington. LangCo NW, Inc. provided services to form, place, and finish the foundation, slab, framing and casting of panels, lifting, bracing, and grouting of all tilt-up panels.