Ron Paulk
Today our incredible foundation crew, Langco, pumped 130 yards into this structure. Brad Lang continually walked around intently observing to make sure he had no blow outs. All went well. The footings on this structure were around 160 yards and this first set of walls were 130 yards and we still have a great deal more to form and pour. Note: this is a single auxiliary residential structure, not a high rise. The back wall is 21′ tall and was poured top to bottom in a single pour to eliminate cold joints. For Paulk Homes this is a record.
Way to go Brad and crew!